Sunday, June 19, 2016

Switching Layout 14x48 Project - Bridge and Creek

Last couple of days, I have worked on the bridge install and the creek it is crossing.

I am re-using a bridge abutment design from my N scale layout re-size for TT Scale and adjusted for the layout.



Test fit of abutments and bridge





Then added a primer sealer to the abutments. Once these are dry I will apply a soupy mixture of joint compound and paint.


This is what my N Scale one looks like


I also got four TT Scale bridge shoes coming from Shapeways (photos of my N Scale ones)





Tuesday, June 14, 2016

TT Scale Bettendorf Trucks - Update III

Today, I received the new batch of trucks from Shapeways. I am very happy with the out come of this batch. Wheel sets have a slight tight fit that will required some reaming of the bearing journal pockets for smooth free rolling, which works for me. I have make these available in my shapeways store.




Now I have trucks for the hopper cars and anything else in the future.

Switching Layout 14x48 Project - Track and Turnout Control Part 2

Yesterday and Today, I finished up installing the slide switches for turnout control. All track shown below is glue in place too. Just need track feeder install.




Sunday, June 12, 2016

Switching Layout 14x48 Project - Track and Turnout Control

I have given up on using servos for turnout control after four fail attempts at building the electronics, so I have gone back to a tried and true solution for me. SPDT Slide switches, I have used these before with good success.

First I cut some re-enforcement pads for the slide switches and start creating pockets for pads and clearance holes for wires.

 

I use a 0.025" music wire and 0.0325" brass tubing for linkage to turnouts. I just make a small channel for the tubing to fit in.








I am also gluing down track and turnouts, adding frog power wire as I go too.